Delivery control for roofing and envelope packages.

Site Manager Pro setup, team training and delivery support for roofing, façade, glazing, rendering and external insulation subcontractors.

PACKAGE SCOPE

Packages we support.

Project setup and delivery controls for the agreed work package, matched to your scope, drawings and quality requirements.

Roofing

  • Flat roofing and waterproofing
  • Pitched roof coverings
  • Roof insulation and associated details
  • Edges, upstands, penetrations and drainage interfaces

Façades & cladding

  • Rainscreen and other cladding packages
  • Support systems and fixings
  • Envelope layers and specified interfaces
  • Panel, elevation and completion records

Curtain walling & external glazing

  • Curtain walling systems
  • External windows and glazing
  • Frames, seals and junctions
  • Supplied inspection, test and handover records

Rendering & external insulation

  • External rendering and substrate preparation
  • External wall insulation (EWI) systems
  • Specified base coats, reinforcement and finishes
  • Beads, openings, repairs and completion checks

What we structure

Structure the envelope by building, elevation, roof zone and installation stage. Keep each layer, junction and package interface tied to its location.

Connect quantities and progress with specified checks, photographs and supplied test records. Record concealed work, changes and remedial actions before the appointed team reviews completion.

Discuss Your Package →
Modern British building with precise facade, glazing, render and roof detailing
WORKFLOW / ROOF ZONE AND ELEVATION DELIVERY

A workflow built around the package.

Your team supplies the scope, specification and technical checks; we configure the agreed locations, stages, evidence and review responsibilities in Site Manager Pro.

01 / DEFINE

Agree the workfront.

Building → elevation or roof zone → system → installation stage. Agree the measured items, interfaces and review responsibilities against the current drawings.

02 / RECORD

Capture the agreed evidence.

Record the contractor’s specified checks and photographs at the agreed stages. Link details, instructions and supplied test records to the correct area.

03 / REVIEW

Resolve and release.

Resolve outstanding items, retain the review history and record the agreed completion status. Keep accepted quantities and changes ready for applications and handover.

Follow a booking through QA and export →

See the workflow in use.

Bookings, QA evidence, approvals and payroll exports.

Watch the Demo →