Partitions & linings
- Metal stud partitions
- Plasterboard
- Insulation
Track partitioning, boarding, finishing and defects with traceable QA evidence.
Project setup and delivery controls for the agreed work package, matched to your scope, drawings and quality requirements.
Partition framing, boarding and finishing, with records at each agreed stage.
Organise wall types, locations and measurable work. Capture checks before close-up and record inspection outcomes and outstanding defects. Setup follows the contractor’s scope, drawings and agreed responsibilities.
Enquire About Dry Lining →
This is an illustrative configuration approach. Your team supplies the scope, specification and technical checks; we configure the agreed locations, stages, evidence and review responsibilities.
Floor → room or zone → partition reference and wall type. Separate framing, insulation, boarding and finishing stages as agreed.
Configure the contractor’s inspection points and required photographs before work is concealed. Use the specified wall build-up and appointed technical reviewer.
Keep held sections, corrections and reinspection visible by location. Accepted quantities and authorised changes support progress and payment review.
Bookings, QA evidence, approvals and payroll exports.